Assembly – Kadabra https://kdbr-tech.tribal-tools.com Landing Wed, 14 Sep 2022 16:06:18 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.2 https://i0.wp.com/kdbr-tech.tribal-tools.com/wp-content/uploads/2022/09/cropped-logo.png?fit=32%2C32&ssl=1 Assembly – Kadabra https://kdbr-tech.tribal-tools.com 32 32 214904476 Pre-AssemblyProtocol https://kdbr-tech.tribal-tools.com/grida-portfolio/pre-assembly-protocol/ Sun, 16 Jan 2022 18:05:17 +0000 https://www.dsngrid.com/grida/?post_type=grida-portfolio&p=193

Detailed Productivity Protocol:

The Pre-Assembly Protocol was made to inhance the assembly line productivity. it starts with adding L-Holders to all PCBs, mass programing each Micro Processing unit and Transceivers and so on... all protocols are photo-based.

  • GROUP
    Production
  • SUB-GROUP
    Assembly
  • INFO
    Pre-Assembly Protocol
]]>
193
AssemblyProtocol https://kdbr-tech.tribal-tools.com/grida-portfolio/assembly-protocol/ Sun, 16 Jan 2022 17:40:17 +0000 https://www.dsngrid.com/grida/?post_type=grida-portfolio&p=173

Assembly Step-by-Step Protocol:

The Assembly Protocol in a step-by-step protocol that was used and updated through over 100 Kadabra Units assembly. it also shows all used equipment and when to use it

  • GROUP
    Production
  • SUB-GROUP
    Assembly
  • INFO
    Assembly Protocol
]]>
173
ElectronicsSystem Tests https://kdbr-tech.tribal-tools.com/grida-portfolio/electronic-system-tests/ Sun, 16 Jan 2022 16:37:54 +0000 https://www.dsngrid.com/grida/?post_type=grida-portfolio&p=132

Pre-Assembly System Check

The Electronics System Test happens before the assembly starts, it makes sure that the system (PCBs, wires, LEDs, switches, etc.) is working well before the assembly line starts and that all components are available.

  • GROUP
    Production
  • SUB-GROUP
    Assembly
  • INFO
    Electronics System Test
]]>
132
OtherProtocols https://kdbr-tech.tribal-tools.com/grida-portfolio/other-protocols/ Sun, 16 Jan 2022 16:21:29 +0000 https://www.dsngrid.com/grida/?post_type=grida-portfolio&p=98

Introduction The Project

there are 5 protocols for Wood working (from Boards to Finishing), QA protocols, equipment safety and inventory control.

  • GROUP
    Production
  • SUB-GROUP
    Assembly
  • INFO
    Other Protocols
]]>
98